Situated within a busy research center, this project entailed the meticulous removal of a section of the exterior wall to facilitate the replacement of an MRI machine. Emphasizing dust control throughout the construction process was of utmost importance, alongside the commitment to minimizing any disruptions.
Demonstrating an unwavering commitment to precision, our team implemented additional precautions during the transportation and installation of the MRI machine, ensuring that it remained unscathed throughout the entire process.
Size1,334 sq ftClientUF Health LocationGainesville, FLCompletedSeptember 2021