The Bluford Avenue Reconstruction Project consists of reconstructing the City of Ocoee’s central transportation artery concurrent with the installation of water and sanitary sewer utilities, stormwater management, and roadside landscaping. The intent of the streetscape project is to develop enhanced stormwater/utility capacity with a boulevard appearance, that will support Downtown Ocoee’s economic growth and future high density development.
Bluford Avenue improvements will be concentrated between Delaware Street and Silver Star Road. Overhead electrical lines will be undergrounded. The road reconstruction is composed of two primary components: Sewer and Western Transmission Main consolidation and the Stormwater-Streetscape improvements. Scope includes 3,000 linear feet of water main upgrades, new gravity sewer system and approximately 3,000 linear feet of new 16” force main. More elements include: storm drainage, concrete curbs, asphalt pavement, brick pavers, sidewalks and landscaping.
Size3000 linear ftClientCity of OcoeeLocationOcoee, FLCompletedNovember 2018ArchitectGAI ConsultantsEngineerCPH, Inc.